|
Sample Inflation Checklist for the Yellow Beast.
Prelauch basket preparation
prior to going to the launch field.
- Install electrical interface panel
- Strap in battery pack.
- Mount both GPS units on map board, turn on and
confirm display settings are as desired.
- Clear track memory on GPSIII.
- Confirm the battery level is full on both GPSs and
Flytec flight instuments.
- Mount FlyTec on map board. Confirm battery level
- Install FM and Aircraft radio in pouches
- Run FM and aircraft power cables, connect to
interface panel. Connect microphones to radios.
- Put map lamp on interface panel
- Connect Overhead light to interface panel. Coil up
and stuff in a pouch.
- Wire up everything and test.
- Install Oxygen tank, route hoses on back wall.
Where to put cannulas? Pressure test and flow test.
- Tie knife cord to
manila rope handle, put knife in red pouch
- Put pencils, pens, highlighter in the gear wall
- Install Pilot’s and Co Pilots personal stuff in
personal pouch.
- Put protractor in the map pouch on the front of the
technical
- Put compass in Pilot personal pouch
- Put current sectional on map board centered as to
make sense for launch
- Place log sheet in upper right corner and use 2
small clamps to keep it in place.
- AM/FM radio and calculator go in the pouch in pilot
corner
- 2 water bottles in pilot and copilot corners.
- Connect night-lights cable directly to battery pack
#2. Turn on using the switch on the black box, confirm operation, then
turn off. Put fresh D battery in the strobe if not already done. Put
lights neatly back in the bag in such a way as to deploy easily.
- Connect Q-Beam to cig-adapter on battery pack #2.
Run cable behind bed and attach Q-Beam to corner carabineer.
- 35mm Camera in pouch
- Load misc. gear bag and food bag under bed.
- Load sectionals
- Strap sleeping bag to the sleep door
- Confirm that Footropes and sandbag safety lines are
installed.
- Confirm that toilet paper, paper towels, ziplock
bags (gallon and quart) are in the bathroom bucket, then put lid on
Envelope Preparations
In a downwind position layout the 40 x 60 tarp
long-ways, with the 60 foot direction running the length of the balloon
Use 10 X 16 tarp to lay out all equipment that will be
used in flight.
Unpack envelope, roll out and position such that load
tapes 1 and 16 are on top
Install deflation port Velcro
and attach red lines. Install safety wire ties on Velcro closures. Pull
excess red line up inside the envelope
Install Valve.
Check Valve operation by
pulling at the appendix end of the red line
Attach envelope to basket, 8
load tape carabineers to the foot ropes using load ring. See
appendix A for layout.
Spread out envelope
Move blue anti sail lines out of the way
Appendix:
- Tie one end of the “Gold” Diffuser support
line to the diffuser at pipe fitting. Run the line through the anti-sail
D ring at the base of the appendix.
- Slide diffuser inside appendix such that the bottom
of the appendix can be closed around the hose.
- Wrap the bottom of the appendix tightly around the
gas hose and secure with the Velcro at the end of the purple line.
- Run the purple line down to the load ring
- When attaching the diffuser, confirm that excess red
lines are all inside the envelope
- The Gold and purple appendix lines should be layed
on the ground along the helium hose.
- The blue anti sail lines and the green appendix line
should be on the ground on the opposite side.
Basket
Equipment Installation
- Put Transponder in pouch on gear wall after
attaching the power cable and antenna to the bottom. Confirm that the
paint roller is in the bottom of the pouch. Lower the unit down in the
pouch and make sure the power connectors are not strained.
- Put MiniDV camera in pouch
- Load 8 flight bags on floor in pilot corner (by
technical).
- Load 20 Inflation sandbags on floor of
basket. (Be very careful not to spill too much sand).
- Load 39 Flight Sandbags into basket on top of
20 inflation bags. Do not put sandbags on top of bed. Some flight bags
may be attached externally if there is not room inside to put these bags,
or if the risk is high that bags will be spilled.
- All external inflation sandbags are attached on the
manila rope that is weaved into the basket, is located about 8 inches
below the upper rim of the basket.
- Attach Blue tie off line to Basket and truck.. At
the basket, the line attaches to the yellow short webbing connected
between the two back suspension lines..
Trail
Rope Installation
Remove drag rope from orange bag and attach to basket
using 3 quicklinks.
Check Quick Release is working and secured.
Attach end of drag rope blue line to the center of the
tie down harness (yellow webbing).
Inflate Envelope
Review Appendix C, “Pre Gas
Turn on checklist”
- Position crew at appointed checkpoints to control
crowd.
- Verify diffuser is in place and secured with
handling lines.
- Begin Helium flow through diffuser.
- Two crew members will hold down the valve until they
can no longer do so. This is probably the right amount of lift to get the
bag to stand up without being violent.
DURING INFLATION, AFTER
ENVELOPE IS VERTICAL
- Install Lights on outside of basket, test with
power.
- Attach Q Beam to outside of basket. Test with
power.
- Install Map Board
- Connect power to both GPS units
- Place xponder antenna, coiled, on the black biner
that holds the bathroom bucket in place.
- Install bathroom bucket
After
Envelope stands up and is inflated:
A.
Lower diffuser using support handling lines – Gold /Purple
B.
Transfer 39 flight bags in basket to carabineers above basket
bolster on the outside of the basket.
C.
Inflation bags stay in basket until weigh-off.
Clean-up
- Collect, Dump Inflation bags – Put into storage
container.
- Collect and Store all remaining bins and equipment.
- Fold and Store all tarps.
- Clear all area of trash or debris left at sight.
- Spread any sand piles as to leave no trace.
Chase Vehicle Check
- Confirm gas level
- Keys!
- Money
- Trailer wiring and safety chains
- Radio Check
Carabineer 1a - Load Tape 1 & 2
1b - Load Tape 3 & 4
2a - Load Tape 5 & 6
2b - Load Tape 7 & 8
3a - Load Tape 9 & 10
3b - Load Tape 11 & 12
4a - Load Tape 13 & 14
4b - Load Tape 15 & 16
Appendix B: Tracker setup in truck
Connect modem cable to black jack by passenger floor
console. Connect other end to the back of the laptop.
Turn on radio. Confirm that on the left is 464.550,
and the right is 144.390. If they are swapped, press the Band button. Get
tim if that does not work.
Connect the power cable from the laptop to the cig
adapter by the passenger console.
Power up the laptop and launch the icon on the desktop
that says “click to start Nerd tracker”.
APPENDIX C Pre-Gas-Turn-On
checklist
Red Valve line secured
2 red deflation port lines secured
Purple Diffuser Line in place, Velcro on, line run
down.
Gold line attached to diffuser, run through ring,
secured at load ring
Tie off in place
All sand bags in place.
No load tapes fouled on valve
Check wind direction with pibal, confirm that we are
lined up with wind
All ropes and lines are clearly not fouled or tangled.
Appendix D – Pre-Launch Checklist
Barograph Turned on
2 radios on, final radio check
Night lights are ready to deploy
Transponder antenna is ready to deploy
All carabineers are locked
Calculate Launch load and record bag count and time on
log sheet.
|